Bored pier inspection in Beveridge

Piers carry a Beveridge house down through clay to firmer material, and they are only visible for the hours before concrete.

  • Once the holes are bored and cages set, before any concrete
  • About 1 hour on site
  • Report within 24 hours
Price your inspectionTell us the stage or service and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookOnce the holes are bored and cages set, before any concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Beveridge bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Beveridge builds

Much of Beveridge sits on the volcanic plain around Mount Fraser, where clay over basalt is common and depth to good bearing changes across a single lot. Where the engineer specifies piers, their depth and steel are what the whole slab relies on.

What we find at this stage in Beveridge

  • Pier depth short of the engineering on one or more holes
  • Spoil or water left sitting in the base of a hole
  • Cage resting on the base with no cover beneath it
  • Pier diameter narrower than drawn
  • Starter bars missing where the slab ties in

The other stages of a Beveridge build

  1. Slab pre-pour inspection in Beveridge2Slab pre-pourWith steel tied and pods placed, the day before concrete
  2. Frame inspection in Beveridge3FrameFrame standing and trusses on, before wrap and sarking
  3. Lock-up (pre-plaster) inspection in Beveridge4Lock-up (pre-plaster)Roof, windows and external doors in, before insulation and plaster
  4. Fixing inspection in Beveridge5FixingCabinetry, doors and trims fitted, painters not yet started
  5. Waterproofing inspection in Beveridge6WaterproofingMembrane on and cured, tiles not yet laid
  6. Pre-handover (PCI) inspection in Beveridge7Pre-handover (PCI)Roughly a week before the builder hands over

All construction stage inspections in Beveridge →

Guides

Construction stage guides for Beveridge

All guides →

Book a bored piers inspection in Beveridge

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Beveridge: common questions

Does every Beveridge house need piers?

No. Piers are specified where the soil report and the engineer call for them, often on deeper fill, rock or highly reactive ground. Your engineering shows whether your lot has them.

What do you measure?

Depth and diameter of each pier against the engineering, cleanliness of the base, cage position and the cover the concrete will give the steel.

How long is the visit?

Usually under an hour, depending on how many piers are drilled.

My Beveridge pier came up shallow on your tape. Now what?

We record it with a measurement and the engineering reference. The builder or engineer decides how it is corrected before concrete.

Is this the same as the surveyor inspection?

No. The surveyor may inspect footings for the permit. We inspect for you and measure against the drawings.

Which standard applies?

AS 2870 for residential footings, read together with the engineering design for your lot.